Xi'an-Ankang High Speed Railway Enters Joint Testing and Trial Operation Phase
On June 27, the Xi'an-Ankang High-Speed Railway entered a joint testing and trial operation phase, with all systems along the line beginning comprehensive inspection and optimization testing. Designed for a speed of 350 km/h, the railway once in operation will reduce rail travel time between Xi'an and Ankang from approximately three hours to less than one hour.

附件: