CR-Huhhot Power Supply Section Carries Out Quality Overhaul of Key Equipment

 

                            

      On October 12, a 10,000-ton heavy freight train was operating between Fushengzhuang Railway Station and Zhuozishan Railway Station on the Tangshan-Baotou Railway under the jurisdiction of CR-Huhhot. In response to potential safety risks posed by strong autumn winds, CR-Huhhot organized teams to conduct quality overhauls on key power supply equipment to enhance wind resistance and ensure safe and stable operation.

  

附件:
回到顶部