Cross-Boundary Passengers on Guangzhou-Shenzhen-Hong Kong High Speed Railway Exceed 30 Million in 2025
In 2025, cross-boundary passenger volume on the Guangzhou-Shenzhen-Hong Kong High Speed Railway surpassed 30 million for the first time, accounting for 30% of the total passenger traffic since the West Kowloon Railway Station border checkpoint opened, an increase of 16.8% compared with the previous year. Since the opening of the West Kowloon Railway Station border checkpoint in September 2018, border inspection authorities have processed over 100 million entries and exits. From Hong Kong West Kowloon Railway Station, passengers can travel directly to 96 stations nationwide, with at least 208 daily departures.

附件: