Henan Section of Zhengzhou-Wanzhou HSR Starts Trial Operation

 Published:2019-11-07  【字体:

  At 12 o'clock on October 28, the G55543 EMU train left Zhengzhou East Station and headed for Dengzhou East Station on Zhengzhou-Wanzhou HSR, marking that the Henan section of Zhengzhou-Wanzhou HSR has entered the trial operation.

  During the one-month trial operation, the parameters of the train diagram will be tested, while fault simulation and emergency drills will be carried out. During the trial operation, the train operation mode of EMUs is divided into operation of partial trains and operation of all trains. According to officials of China Railway Zhengzhou Group Co., Ltd., during the trial operation, China Railway Zhengzhou Group Co., Ltd. will implement full inspections on the main line, arrival and departure tracks, train operation equipment of relevant connecting lines, high platforms and other railway buildings at stations along the trial section under its management, to ensure that all technical conditions for HSR operation are met.

  During the train operation according to the diagram, the relevant station and vehicle organizations under the management of China Railway Zhengzhou Group Co., Ltd. will organize the operation of the test EMUs according to the planned standards, and at the same time simulate the handling of passenger transport services such as passenger broadcasting guidance and train receiving and departing on the platform. Relevant engineering construction units and relevant management units of China Railway Zhengzhou Group Co., Ltd. will strengthen the quality maintenance of main train operation facilities such as track, bridge, station & yard, communication, signaling, traction power supply and electric power supply, to ensure the smooth implementation of the test.

附件:
回到顶部