Zhengzhou-Fuyang High Speed Railway Henan Section Begins Integrated Commissioning and Test

 Published:2019-08-23  【字体:

  On August 18, the integrated commissioning and test started on the Henan section of Zhengzhou-Fuyang High Speed Railway. The simultaneous track inspection by the comprehensive inspection train and inspection confirmation train marks the countdown to the opening and operation of the a key branch in the radiated High Speed Railway network in Henan.

  Zhengzhou-Fuyang High Speed Railway starts from Zhengzhou in Henan Province, passes through Kaifeng (Weishi County), Xuchang and Zhoukou to Fuyang in Anhui Province, with a total length of about 281 km, of which the length of the main line in Henan Province is 211.8 km. The main line is designed as a double-track High Speed Railway with a target speed of 350 km/h.

附件:
回到顶部