First Logistics Center and Dedicated Line along Haolebaoji-Ji’an Railway Put in Service

 Published:2020-06-10  【字体:

  At 12:05 on May 28, a No. 84187 freight train carrying coal departed from Haizetan Logistics Center, entered Haizetan Station of Haolebaoji-Ji’an Railway, and then headed south for Wuhan, Hubei. This is the first train put in service after the dedicated line of Haizetan Logistics Center was put into operation, marking the full opening of Haizetan Logistics Center of Haolebaoji-Ji’an Railway.

  Located near Haizetan Station in Jingbian County, Yulin City, Shaanxi Province, the logistics center is one of the collection, distribution and transportation system projects of Haolebaoji-Ji’an Railway. With a design dispatching capacity of over 15,000,000 t/a, it is regarded as the "land port" for logistics in Jingbian. It is the first dedicated line and logistics center put in service along Haolebaoji-Ji’an Railway and it is also a large-scale 10,000t full-train loading station project completed in China.

  Haolebaoji-Ji’an Railway is the heavy haul railway with the maximum length constructed in one phase in the world. China Railway Xi'an Group Co., Ltd. undertakes the equipment maintenance and operation management of the 961.487 km long Haolebaoji South-Dengzhou West Section. In order to break through congestion points for incremental transport volume of Haolebaoji-Ji’an Railway as soon as possible, China Railway Xi'an Group Co., Ltd. attached great importance to construction of the dedicated line under its administration, and collaborated with the construction contractor, the designer, and the supervisor, carried out research to overcome construction difficulties every week, and thus ensured the completion of the dedicated railway line of Haizetan Logistics Center on schedule.

附件:
回到顶部